YSN-A052

Mass Supply Case of Full Set PV1-F Cables for 50MW European Ground PV Power Station

Aug 27, 2026

This cooperative project is located in Central Europe plain with a total installed capacity of 50MW, a key local low-carbon new energy infrastructure project. Our company won the bid for the whole DC PV cable supply section of the power station. Supplied products cover four mainstream sizes of PV1-F weather-resistant cables: 1.5mm², 2.5mm², 4mm² and 6mm², with total delivery length over 980,000 meters.

The project site features huge seasonal temperature differences, frost in cold winters and intense ultraviolet radiation in summers, plus slightly corrosive soil. We upgraded cable formulas according to working conditions, adopting double-layer cross-linked polyolefin insulation sheath to strengthen UV resistance, low temperature tolerance and acid-alkali resistance. All finished cables pass TÜV, CE and RoHS international certifications, meeting the standard of 25-year long outdoor service life.

We arranged exclusive priority production schedules, applying full-automatic extrusion and online voltage resistance testing. Every cable reel undergoes full self-inspection of insulation resistance, flame retardancy and bending fatigue before shipment. Goods were delivered by four 20GP full container sea freight, with complete English documents including original material test reports, certification papers, packing lists and customs clearance files.

Since grid-connected completion, zero faults such as aging, electric leakage and cable damage have occurred. The power station operation team has signed a letter of intent for energy storage supporting cables next year, forming stable long-term new energy supply partnership.