A newly built large intelligent manufacturing industrial park in North America includes automatic production workshops, energy storage power distribution rooms, office buildings and park street light pipelines. We won the general supply bid for all high and low voltage cables of the park. High voltage model is YJV22-8.7/10kV armored cable; low voltage products include YJV, VV flame retardant distribution cables and shielded equipment connection cables, total delivery length over 720,000 meters, fully compliant with US UL and CSA electrical standards.
North America factory electrical codes are extremely strict, requiring cables to resist mechanical impact, Class C flame retardancy, equipment oil pollution and adapt to indoor & outdoor all-weather laying. High voltage cables adopt thickened insulation to boost voltage safety factor; low voltage flame retardant wires are added with eco-friendly flame retardant masterbatch. Oxygen-free copper conductors own stable resistivity to guarantee continuous stable power supply for large automatic equipment. We opened an exclusive US-standard cable production line with three quality control procedures: incoming raw material inspection, in-process patrol check and finished product high voltage breakdown test. Document system fully fits North America customs clearance and local electrician acceptance standards, supplying full English qualifications such as UL certificates, temperature rise test reports and conductor material analysis sheets. Packages use IPPC fumigated solid wood pallets to meet North America wood import quarantine regulations.
We arranged exclusive priority production schedules, applying full-automatic extrusion and online voltage resistance testing. Every cable reel undergoes full self-inspection of insulation resistance, flame retardancy and bending fatigue before shipment. Goods were delivered by four 20GP full container sea freight, with complete English documents including original material test reports, certification papers, packing lists and customs clearance files.
After full power-on and operation, the park power distribution system runs steadily without voltage fluctuation or overheating overload. The park operation group signed a 3-year maintenance consumable framework agreement, prioritizing our complete cable solutions for subsequent workshop expansion and energy storage capacity expansion projects.